EMC pre-compliance testing and CE marking support

EMC pre-compliance testing finds emission, immunity and safety problems while they are still cheap to fix. We check your device in our lab, review the design against the standards that apply, and prepare it and its documents for the accredited laboratory, so the formal test confirms what we already know instead of revealing something new.

Electrical safety measurement on a controller board with an installation tester

Who issues the certificate

Formal EMC and safety test reports are issued by accredited laboratories, and the CE declaration of conformity is signed by the manufacturer. We are neither. Our part is everything before and around the formal test: design choices, pre-checks, documents, and changes if a result comes back marginal.

Custom test box with adjustable AC and DC current settings and a trigger button

Why devices fail their first formal test

Most first-time failures have ordinary causes:

Each one means another laboratory booking, another wait and often another board revision. We look for all of them before the device leaves our lab.

Radiated or conducted emissions from switching regulators, clocks and long cables

Creepage and clearance distances too small for the working voltage

An enclosure or cable shield that is poorly grounded

Missing or incomplete technical documentation

Parts or materials without proof of RoHS conformity

What we do

Design review for compliance

Before a device goes for testing, and ideally before its board is released, we review:

  • PCB layout: high-frequency loops, return paths and the placement of filters;
  • mains and supply input: filtering, surge and transient protection;
  • isolation: creepage, clearance and insulation barriers between mains and low voltage;
  • radio: use of pre-certified modules and their integration rules;
  • materials: RoHS-conformant parts and supplier declarations;
  • documents: ratings, labels, user instructions and the technical file.
PCB layout with copper pours, routed signal traces and connector footprints along the edge

Pre-compliance measurements

In our lab we measure what can be measured without an accredited chamber, which is enough to find most problems and compare fixes:

  • emissions from the board and its cables, located with near-field probes;
  • effectiveness of supply filtering and suppression;
  • creepage and clearance on the assembled device;
  • insulation and protective earth on mains-powered products;
  • temperatures inside the enclosure under full load.
Electrical safety measurement on a controller board with an installation tester

Laboratory preparation and support

When the device is ready, we help you choose an accredited laboratory in Moldova, Romania or elsewhere in the EU, prepare the test units and documents, read the results with you and make the design changes a marginal or failed result calls for.

Custom test box with adjustable AC and DC current settings and a trigger button

Standards we prepare devices for

CE marking for electronics sold in the EU:

  • EMC Directive, with EN 55032 for emissions and the EN 61000 series for immunity;
  • Low Voltage Directive compliance for mains-powered equipment, with EN 62368-1 for IT and multimedia equipment and IEC 61010-1 for measurement, control and laboratory equipment;
  • Radio Equipment Directive compliance for products with Wi-Fi, Bluetooth, LoRa or cellular radios;
  • RoHS for restricted substances.

Outside the EU: FCC rules for emissions of digital and radio devices sold in the United States.

Your own requirements: internal quality standards or a customer's technical specification.

When to start

The earlier, the cheaper. A creepage distance or a filter is free to change on a schematic and costly to change after tooling. We include compliance review in every electronic device design and PCB design project, and run pre-compliance checks on the first prototypes, alongside functional testing.

Schematic and matching PCB layout of a controller board in the design tool

What you receive

Much of this work is for mains-powered and radio products in EV charging, industrial control and IoT telemetry.

A compliance plan: the directives and standards that apply, and the tests each needs

A design review report with the risks found and the changes made

Pre-compliance measurement results, before and after any fix

Test units and documents prepared for the laboratory

Support until the laboratory's report is issued